NAWIC NSW | PROBUILD Greenland Centre Site Walk
Join us, together with Probuild for a fascinating
site walk of the Greenland Centre Sydney, a 235 meter skyscraper due for
completion in the 3rd quarter of 2020. We start with a presentation by the
Probuild project team, explaining the challenges faced on the project to date
and the complex design solutions that have been implemented. The walk will focus
specifically on the building’s structure where the old building will meet the
new.
Originally a brutalist building occupied by Sydney
Water Board built in 1965, this old structure has been stripped back and new
life has been injected into its strong bones. Currently sitting at Level 28, we
have a recently completed 7m high transfer structure, sitting at 90m above
Street level. This transfer structure, referred to as the Belt Truss, separates
the low rise from the high rise and effectively transfers the load from the
high rise (41 new levels) into the large existing structural steel columns and
beams of the low rise encased in new reinforced concrete. This walk will give
NAWIC members access to the team that have managed to bring the complexities of
the belt truss design from its conception into reality - Building
in the Sky
We will also have the opportunity to view some of
the nearly completed high-end apartments reaching completion on the lower
levels. The future high-rise will also have the unique and revolutionary
"Sydney Balconies" allowing true indoor-outdoor connections with the
glass-fronted balconies providing protection from wind and noise.
Due for completion in 2020, Greenland will be the
tallest residential tower in Sydney’s CBD, the development will house 479 spectacular
1, 2 and 3 bedroom luxury apartments, plus stunning sub-penthouse and penthouse
residences across 67 levels.
The building will also include retail tenancies,
carparks and a creative hub as part of City of Sydney’s public domain works.
NAWIC and Probuild will be
hosting a post-walk networking event at the Edinburgh Hotel directly across
from the Project, and we welcome you to join us for drinks and food with the
project team on hand to answer any questions you may have
Attire: Hard Hat, High Vis,
Glasses, Gloves and Safety Footwear
Start
– Presentation in site office - Level 7, 227 Elizabeth Street, Sydney NSW 2000
Site Walk – Corner Pitt and Bathurst Street,
Sydney NSW 2000